Suite 101, First floor, R/O 45-47 Station Road, North Harrow, HA2 7SU
9am - 6pm
0203 652 6318

Building Regulations Drawings

Building Regulations Drawings

 

All architectural projects in the U.K. require Building Regulations Drawings for planning approval from their respective boroughs.

Building Regulations Drawings

3D Modelling is fantastic for developing the design with the customer but before this takes place projects will need Floor Plans, Elevations and Sections. All Building Regulations Drawings are produced quickly and efficiently from the model and automatically updated as the project progresses.

We create Building Regulations Drawings from our planning drawings or planning drawings you provide. We can provide full building regulations drawings to meet your requirements and specification.

Following the Measured Survey, drawings are produced showing what the site currently looks like and what the site will look like after development. These are known as existing and proposed drawings. Once produced a first draft is given to the client and from here a discussion takes place between designer and client to come up with the perfect design to suit the site and the clients budget. Once the final design is approved by the client it would go to the next step which is to apply for planning.

 

Next Steps

The building inspector will visit the site to issue a final completion certificate to prove that all works completed complied to the U.K. regulations. They have the power to refuse the issuing of a completion certificate if the building work does not comply therefore you need a company with reputable experience. We can provide you with minor works such as house alterations and extensions, through to large scale new build developments and conversions. As we have a 100% success rate of application approvals meaning your project is in safe hands.